PRODUCT NAME: COMPONENT NAME: DRAWING NO:
WHY DO YOU SELECT COB SELF-LUBRICATING BEARING? NEW DESIGN SAVE SPACE REDUCE WEAR REDUCE FRICTION COEFFICIENT REDUCE NOISE REDUCE COST ORIGINAL DESIGN OTHER REASON WHICH KIND OF BEARING IS APPLIED IN YOUR ORIGINAL DESIGN? IS IT SATISFACTORY? YES NO IF NOT, WHY?
SHAPE AND DIMENSION OF BEARING (DRAFT)
TYPE OF LOAD: STATIC LOAD DYNAMIC LOAD ALTERNATING SHOCK- LIKE VIBRATING
BEARING LOAD: RADIAL LOAD N AXIAL LOAD N RADIAL SURFACE PRESSURE N/mm2 AXIAL SURFACE PRESSURE N/mm2
TYPE OF MOTION: ROTATING ROCKING RECIPROCATING SHAFT MOTION BEARING MOTION HORIZONAL FIX VERTICAL FIX
MOTION TIME: CONTINUOUS INTERMITTENT times/day FREQUENCY time/minute INTERVAL rounds/day MOTION DISTANCE km
MOTION COEFFICIENT: ROTATING: N rpm ROCKING ANGLE: ± ° DISTANCE: ± mm LINEAR SPEED: V m / s ROCKING FREQUENCY: cpm RECIPROCATING FREQUENCY: cpm
SHAFT: O.D.Ø mm MATERIAL SURFACE ROUGHNESS: HARDNESS: SURFACE TREATMENT: IS SHAFT DIAMETER CHANGEABLE? YES NO
HOUSING: I.D.Ø mm MATERIAL: SURFACE ROUGHNESS: LEAD-IN CHAMFERS: ° IS I.D. CHANGEABLE? YES NO
LUBRICATING CONDITIONS: DRY LUBRICATING WHEN MOUNTING OILED REGULAR LUBRICATING OTHERS
LUBRICANT: OIL: NAME VISCOSITY GREASE SOLID LUBRICATING PLATING OTHERS
ENVIRONMENT: IN AIR IN WATER IMPURITY SEALING OTHERS
TEMPERATURE: MAX. TEMP. °Ç M IN. TEMP. °Ç NORMAL TEMP. °Ç
SERVICE LIFE REQUIRED: TOTAL LIFE (OPERATING HOURS): TOTAL ALLOWABLE RADIAL WEAR: mm FRICTION COEFFECIENT>= SURFACE PROTECTION: COPPER PLATED TIN PLATED ZINC PLATED REQUIRED HOURS OF PROTECTION IN SALT FOG CHAMBER: Hours
IS BEARING I.D. PROCESSED AFTER MOUNTING?
NO BORING BROACHING REAMING POLISHING OTHERS
REQUIRED CLEARENCE AFTER MOUNTING: MAX mm MIN mm
INSPECTION METHOD: BEARING O.D.: BEARING I.D: BEARING LENGTH: WALL THICKNESS: OTHER DIMENSIONS:
ADDITIONAL INFORMATION (PLEASE STATE PROBLEMS TO BE FOCUSED on AND DESCRIBLE THE MANUFACTURER, PRODUCT NAME AND DIMENSION/SPECIFICATION OF THE ORIGINAL PRODUCT YOU USED):
ACTION: QUOTE DUE DATE DRAWING DUE DATE SAMPLE PRODUCTION pieces DUE DATE VOLUME PRODUCTION pieces DUE DATE LOT PRODUCTION pieces DUE DATE
ANNUAL DEMAND (PLEASE PROVIDE CORRECT QUANTITY UPON WHICH WE WILL SELECT MATERIAL):
COMPANY: DEPARTMENT: CONTACT PERSON: ADDRESS: TEL: FAX: e -MAIL: SIGNATURE: